深井强采动大巷群围岩锚固与跨层卸压洞群协同控制

Collaborative control for anchorage and cross-seam destressing holes group in surrounding rock of main roadway group affected by deep strong dynamic pressure

  • 摘要: 为解决传统卸压方法中单巷独立卸压及卸压与支护互扰的难题,综合采用现场测试、数值模拟、相似模拟、理论计算及工程实践等方法,开展传统巷内钻孔卸压与不同类型煤巷两帮内部卸压模式的应力差异化响应特征研究。提出融合双区卸压(停采煤柱区与大巷煤柱区)、跨层布置、多巷道应力优化和浅锚深卸协同思路的大巷群围岩锚固与跨层卸压洞群协同控制技术;建立煤巷围岩全锚索厚层整体锚固承载结构力学模型,剖析大巷群围岩锚固控制机制;基于相似模拟试验验证跨层卸压洞群技术的合理性与有效性,明晰大巷群围岩锚固与跨层卸压洞群协同控制机制,并开展现场工程实践。结果表明:采用全锚索配组合式大托盘的整体锚固结构,其极限承载能力较同规格可接长锚杆支护提升约18.3%;全锚索结构的高强度浅部承载基础,为停采煤柱区与大巷煤柱区造穴卸压提供了必要的先决条件。双区卸压洞群实现空间分置和功能互补,可完成静压高应力转移与动压高应力阻断,形成一静一动的双重应力调控体系,能够在同一站点实现2条主巷道的同步卸压保护。跨层卸压洞群可有效吸引并耗散高应力,其中,围岩原垂直应力峰值降低率达36.2%,偏应力第二不变量峰值降低率达45.5%;应力峰值线向深部转移5.0~5.5 m,而浅部7.5~8.5 m内的锚固区应力不受造穴影响;大巷煤柱内部应力无明显扰动,实现多巷道应力场的全局优化协同控制。现场表明,在停采煤柱宽度由100 m缩减至50 m的强动压条件下,相较于未实施卸压措施的对照段,采用该控制技术后,围岩变形量与支护结构受力显著降低并提前趋于稳定,保障了工作面安全回采至优化停采。

     

    Abstract: To overcome the drawbacks of traditional destressing methods, which are characterized by single-roadway independent destressing and interference between destressing and support, a comparative investigation is conducted on the stress response characteristics between conventional in-roadway drilling destressing and various internal destressing modes implemented within the two ribs of coal roadways. This investigation integrates field testing, numerical simulation, physical similarity simulation, theoretical calculation, and engineering practice. A collaborative control technology for the surrounding rock of the main roadway group is proposed, incorporating the innovations of dual-zone destressing (stopping-line coal pillar zone and main-roadway coal pillar zone), cross-strata layout, multi-roadway stress optimization, synergy of shallow anchorage and deep destressing. A mechanical model is established for the thick-layer integrated anchorage load-bearing structure of coal roadway surrounding rock using full cables, and the anchorage control mechanism for the surrounding rock of the main roadway group is analyzed. The rationality and effectiveness of the cross-strata internal destressing technology are verified through similarity simulation tests, and the synergistic control mechanism of surrounding rock anchorage and cross-strata internal destressing for the main roadway group is clarified, which is then implemented in field engineering practice. The results show that, the ultimate load-bearing capacity of the integrated anchorage structure using full cables with combined large steel trays is approximately 18.3% higher than that of the support system using extensible rock bolts of the same specification. The high-strength shallow load-bearing foundation formed by the full-cable structure provides the necessary precondition for internal destressing in the stopping-line coal pillar zone and the main-roadway coal pillar zone. The destressing boreholes in the two zones are spatially separated and functionally complementary, enabling the transfer of high stress during static pressure and the blocking of high stress during dynamic pressure, thereby forming a dual regulation system of static and dynamic. This allows simultaneous destressing protection for two main roadways from a single location, overcoming the drawbacks of traditional destressing methods. The implementation of cross-strata internal destressing effectively attracts and dissipates high stress. The original vertical stress peak in the surrounding rock is reduced by 36.2%, and the second invariant of deviatoric stress peak is reduced by 45.5%. The peak stress line is shifted 5 to 5.5 meters deeper into the rock mass, while the stress within the anchorage zone in the shallow part, ranging from 7.5 to 8.5 meters, remains unaffected by destressing, and no significant disturbance is observed in the stress of the main roadway coal pillar. This achieves global optimization and collaborative control of the multi-roadway stress field. Field application demonstrates that under strong dynamic pressure conditions, where the stopping-line coal pillar width is optimized from 100 m to 50 m, the surrounding rock deformation and the support structure stress in the section employing the collaborative control technology are significantly reduced and stabilize earlier, compared with the control section without destressing implementation. This ensures the safe extraction of the working face up to the optimized stopping line.

     

/

返回文章
返回