Abstract:
To overcome the drawbacks of traditional destressing methods, which are characterized by single-roadway independent destressing and interference between destressing and support, a comparative investigation is conducted on the stress response characteristics between conventional in-roadway drilling destressing and various internal destressing modes implemented within the two ribs of coal roadways. This investigation integrates field testing, numerical simulation, physical similarity simulation, theoretical calculation, and engineering practice. A collaborative control technology for the surrounding rock of the main roadway group is proposed, incorporating the innovations of dual-zone destressing (stopping-line coal pillar zone and main-roadway coal pillar zone), cross-strata layout, multi-roadway stress optimization, synergy of shallow anchorage and deep destressing. A mechanical model is established for the thick-layer integrated anchorage load-bearing structure of coal roadway surrounding rock using full cables, and the anchorage control mechanism for the surrounding rock of the main roadway group is analyzed. The rationality and effectiveness of the cross-strata internal destressing technology are verified through similarity simulation tests, and the synergistic control mechanism of surrounding rock anchorage and cross-strata internal destressing for the main roadway group is clarified, which is then implemented in field engineering practice. The results show that, the ultimate load-bearing capacity of the integrated anchorage structure using full cables with combined large steel trays is approximately 18.3% higher than that of the support system using extensible rock bolts of the same specification. The high-strength shallow load-bearing foundation formed by the full-cable structure provides the necessary precondition for internal destressing in the stopping-line coal pillar zone and the main-roadway coal pillar zone. The destressing boreholes in the two zones are spatially separated and functionally complementary, enabling the transfer of high stress during static pressure and the blocking of high stress during dynamic pressure, thereby forming a dual regulation system of static and dynamic. This allows simultaneous destressing protection for two main roadways from a single location, overcoming the drawbacks of traditional destressing methods. The implementation of cross-strata internal destressing effectively attracts and dissipates high stress. The original vertical stress peak in the surrounding rock is reduced by 36.2%, and the second invariant of deviatoric stress peak is reduced by 45.5%. The peak stress line is shifted 5 to 5.5 meters deeper into the rock mass, while the stress within the anchorage zone in the shallow part, ranging from 7.5 to 8.5 meters, remains unaffected by destressing, and no significant disturbance is observed in the stress of the main roadway coal pillar. This achieves global optimization and collaborative control of the multi-roadway stress field. Field application demonstrates that under strong dynamic pressure conditions, where the stopping-line coal pillar width is optimized from 100 m to 50 m, the surrounding rock deformation and the support structure stress in the section employing the collaborative control technology are significantly reduced and stabilize earlier, compared with the control section without destressing implementation. This ensures the safe extraction of the working face up to the optimized stopping line.