吴昕. 采空区下综采工作面开切眼一次成巷支护技术[J]. 煤炭科学技术, 2015, (9).
引用本文: 吴昕. 采空区下综采工作面开切眼一次成巷支护技术[J]. 煤炭科学技术, 2015, (9).
Wu Xin. One driving completed gateway support technology applied to open-off cut in fully-mechanized coal mining face under goaf[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (9).
Citation: Wu Xin. One driving completed gateway support technology applied to open-off cut in fully-mechanized coal mining face under goaf[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (9).

采空区下综采工作面开切眼一次成巷支护技术

One driving completed gateway support technology applied to open-off cut in fully-mechanized coal mining face under goaf

  • 摘要: 为实现采空区下戊9.10-19070开切眼一次成巷支护,采用弹塑性力学理论分析了开切眼顶板稳定性,通过模糊综合评判得出其围岩类别,从围岩应力、围岩强度、巷道支护及设备选型方面探讨了戊9.10-19070开切眼一次支护可行性,根据工程类比法确定了开切眼一次成巷支护方案,并对围岩变形进行了监测。研究结果表明:戊9.10-19070开切眼上覆戊8-19070采空区底板最大破坏深度为8 m,其煤层以上10 m顶板为完整岩层,开切眼围岩属Ⅲ类中等稳定,支护形式为锚网索;经分析确定戊9.10-19070开切眼一次支护是可行的,并确定了一次成巷支护具体支护参数和施工顺序;一次成巷支护后,开切眼顶板最大离层量21 mm,顶底板最大移近量170 mm,两帮最大移近量80 mm,实现了采空区下开切眼一次成巷支护,经济效益和社会效益明显。

     

    Abstract: In order to realize one driving completed gateway support of E9.10- 19070 open-off cut under goaf,a elastic-plastic mechanics theory was applied to analyz e the roof stability of the open- off cut. The surrounding rock type was obtained from a fuzzy comprehensive judgment.From surrounding rock stress,surrounding rock stren gth,gateway support and equipment selection aspect,a feasibility on one support of open-off cut in E9. 10-19070 seam was discussed .According to the engineering analogy method,one driving completed gateway support plan of the open-off cut was determined and the monitoring and measuring was conducted on the surrounding rock deforma tion. The study results showed that a goaf in E8-19070 seam was above the open-off cut in E9.10-19070 seam,a max failure depth of the floor was8 m,the roof with 10 m a bove the seam was an integrated strata,the surrounding rock of the open-off cut was in工type medium stable and support mode was a bolt 1 steel mesh 1 anchor.The analy sis showed that the one support of the open-off cut in E9. 10-19070 seam would feasible and certain support parameters and construction sequence of the one driving com pleted gateway were set up.After the one driving completed gateway support conducted,a max value of the roof bed separation above the open-off cut was 21 mm,the max value of the roof and floor convergence was 170 mm and the max convergence of the two sidewalls was 80 mm.The one driving completed gateway support of the open-off cut under the goaf was realized and the economic and social benefits were obvious.

     

/