弱胶结地层TBM开挖早期围岩应力释放与支护时变响应

Stress release of surrounding rock and time-varying response of support in extremely early stage of TBM excavation in weakly cemented strata

  • 摘要: 针对TBM斜井穿越弱胶结地层过程中围岩受力状态及变形具有显著时空效应的问题,开展考虑围岩应力释放及等效支护荷载的围岩−支护协同作用弹塑性解析模型研究。将锚杆、锚索、锚网、反底拱和TBM自重等对围岩的荷载等效为均布荷载施加于围岩,结合围岩应力释放效应,推导斜井围岩变形时空演化模型。通过室内试验获取现场弱胶结岩石的物理力学参数并验证理论解析解。将预设函数应用于有限差分法数值模型中,模拟围岩应力逐渐释放过程。结果表明:TBM开挖极早期的围岩力学响应强烈,支护荷载在前3 d内骤增,并受重力影响呈现拱顶>拱肩>拱腰的空间不对称演化特征;构建的考虑工序滞后联合支护解析模型证实,通过将TBM主机压覆力等效为早期底板约束,合理修正了反底拱约1 d的实际施工滞后误差,获得了早期协同支护弹塑性解析解;现场顶板位移变化趋势与理论值变化趋势类似,且现场监测及理论的顶板位移最大收敛值分别为49和68 mm,处于同一数量级,验证了考虑围岩应力释放及现场支护的围岩弹塑性解能较好描述围岩塑性区发展及塑性位移发展特征;通过将围岩应力释放效应引入数值模拟中,验证了考虑围岩应力释放效应的必要性,支护对围岩变形的保护作用集中于顶板、底板,塑性区范围较无支护时分别减少14.78%~15.10%、14.99%~15.91%,且对于西部弱胶结岩石现场支护手段能有效限制围岩变形。对比无支护及支护下最大、最小主应力,可知支护限制了围岩应力释放。研究结果可为西部弱胶结地层斜井支护方式、时机设计提供理论依据。

     

    Abstract: To address the pronounced spatiotemporal effects on the stress state and deformation of surrounding rock during TBM excavation of inclined shafts through weakly cemented strata, an elastoplastic analytical model of surrounding rock–support interaction is developed by considering surrounding-rock stress release and equivalent support loads. Loads exerted on the surrounding rock by rock bolts, cable bolts, wire mesh, the invert arch, and TBM self-weight are converted into an equivalent uniformly distributed load. By incorporating surrounding-rock stress release, a spatiotemporal evolution model for surrounding-rock deformation in inclined shafts is derived. Physical and mechanical parameters of the weakly cemented rock are obtained from laboratory tests and used to validate the analytical solution. A prescribed function is introduced into a finite-difference numerical model to simulate the progressive release of surrounding-rock stress.It is shown that an intense mechanical response is induced in the surrounding rock during the very early stage of TBM excavation. The support load increases sharply during the first 3 d, and a gravity-induced spatial asymmetry is observed, with the load decreasing in the order of crown, shoulder, and haunch. A joint-support analytical model incorporating construction-sequence lag confirms that treating the load exerted by the TBM main machine as an early floor constraint reasonably corrects the approximately 1 d construction lag of the invert arch, and an early-stage elastoplastic analytical solution for coordinated support is obtained. Similar trends are observed between the measured and theoretical roof displacements, while maximum roof convergences of 49 and 68 mm, respectively, are obtained from field monitoring and theoretical analysis; these values are of the same order of magnitude. The elastoplastic solution incorporating surrounding-rock stress release and field support is verified to describe the development of the plastic zone and plastic displacement. After surrounding-rock stress release is introduced into the numerical simulation, the necessity of considering this effect is verified. The protective effect of support on surrounding-rock deformation is concentrated at the crown and floor; relative to the unsupported condition, the plastic-zone extent is reduced by 14.78%−15.10% at the crown and by 14.99%−15.91% at the floor. Deformation of weakly cemented rock in western China is effectively limited by field support measures. Comparison of the maximum and minimum principal stresses under unsupported and supported conditions shows that stress release in the surrounding rock is restrained by support. These results provide a theoretical basis for designing support schemes and installation timing for inclined shafts in western weakly cemented strata.

     

/

返回文章
返回