  • 摘要: 基于保护层开采是解决低透气性高瓦斯突出煤层群卸压防突有效办法的现状,针对煤层群中不具备常规保护层(煤层厚度≥0.8 m)开采条件的问题,及实现下部被保护煤层卸压增透的难题,提出了极薄、薄煤层半煤岩保护层开采技术的解决思路。通过理论分析了半煤岩工作面采高与下部煤层卸压的关系,并基于沙曲煤矿地质条件,采用数值模拟分析得出:被保护煤层膨胀变形率随着保护层开采厚度的增加大致呈线性增长。据此在沙曲煤矿22201工作面进行现场工业性试验,试验结果表明:在观测7个月时间内工作面共推进了602.6 m,平均每天推进3.05 m,共计出煤约181 020 t。从现场生产实际可知,工作面及回采巷道内配置的设备满足生产需要,半煤岩工作面基本可实现安全高效开采。

     

    Abstract: Exploration of protective seam is an effective method to solve gas outburst problems in coal seams which have high gas outburst and low permeabllity.H owever,conventional protective layer mining is difficult to implement in coal mines when a protective seam thicker than 0.8 m does not exist.The realization of pressure r elief and permeability increase in lower protected seam is also a problem.In this paper,a method of semi-coal rock protective laying mining in thin coal seam is propose d.The relationship between mining height of semicoal rock and pressure relief of lower coal seam was analyzed.Numerical simulation was conducted in Shaqu Coal Min e and the results show that the expansion deformation rate of the protected coal seam is linearly proportional to the thickness of protective coal seam.The semicoal roc k protective laying mining was carried out on No.22201 working face of Shaqu Coal Mine.It is found that the working face advanced602.6 m in total and 3.05 m daily on average and the total coal production was about 181 020 tons during the 7 months period implementing the method.The field practice suggests that equipment in workin g face and roadway is able to meet the production needs and the semicoal rock working face can be mined safely and efficiently.

     

/

返回文章
返回