大采高工作面片帮机理及控制技术研究
Study on mechanism and control technology of rib spalling in large mining height working face
-
摘要: 针对大采高工作面在来压期间顶板破碎、架间漏矸、煤壁片帮、端部冒顶等一系列安全问题,以三道沟煤矿八盘区85205大采高工作面为研究对象,采用理论分析、实验室试验与现场实测等方法,得到了85205大采高工作面5-2煤层开采时矿压显现规律与煤壁片帮控制关键技术。研究结果表明:当煤层与其上覆岩层间摩擦力大于等于均布荷载时,煤层与其上岩层交界面处为容易发生片帮区域;当煤层与其上覆岩层间摩擦力小于均布荷载时,煤层在采高位置的0.578倍区域处为容易发生片帮区域。根据煤体强度试验数据分析确定了85205大采高工作面煤壁属Ⅲ类不稳定煤壁。通过现场监测可知,工作面回采期间,初次来压步距为75 m,周期来压步距为17.5~25.8 m,平均步距为22.7 m,侧向支承压力的影响范围在14~16 m,区段巷道最大顶底板及两帮移近量均小于警戒值。最后结合工作面情况综合分析,提出设备检修期间防片帮的“六必须”管理技术措施和来压期间提高支架初撑力、打设防护网及动态全方位监测等综合防治方法。Abstract: In view of a series of safety issues such as roof breakage,inter-frame leakage,rib spalling and roof fall at the end of large mining height working face during weighting period,the No.85205 large mining height working face in Sandaogou Coal Mine is taken as the research object.Theoretical analysis,laboratory test and field measurements is used to obtain the strata behavior and key technology of rib spalling control in 5-2 coal seam of No.85205 large mining height working face.The results show that when the friction force between the coal seam and its overlying strata is equal to or greater than the uniform load,the interface between the coal seam and its overlying strata is prone to spalling,and when the friction force between the coal seam and its overlying strata is less than the uniformly distributed load,the coal seam at 0.578 times of mining height is prone to spalling.According to the analysis of the experimental data of coal strength,the coal wall of No.85205 mining face with large mining height is determined to be a Class Ⅲ unstable coal wall.According to on-site monitoring,the initial weighting step distance is 75 m,the periodic weighting step distance is 17.5~25.8 m,the average stepping distance is 22.7 m,and the influence range of lateral bearing pressure is about 14~16 m.The maximum top and bottom plates and the approach distance of the two sides of the section roadway are less than the warning value,and the support is finally combined with the comprehensive analysis of the working face,the "SIX-MUST" management technical measures for preventing rib spalling during equipment maintenance and comprehensive prevention measures such as increasing support force,laying protective net and dynamic omni-directional monitoring are put forward.