高级检索

近距离煤层同采下位厚煤层综放工艺参数研究

Study on Fully-Mechanized Caving Technique Parameters in Contiguous Seams and Lower Thick Seam by Simultaneous Mining

  • 摘要: 为了提高近距离煤层同采下位厚煤层综放开采的顶煤采出率,在分析泉店煤矿地质条件基础上,采用PFC数值模拟软件优化分析了顶煤的放煤参数,确定采用0.6 m的放煤步距,上行放煤工艺方式。放煤实测结果表明:单架平均放煤时间为84 s;顶煤的破碎块度在10 cm以下,直接顶破碎块度在30 cm以下;放煤后未见矸石的放煤口占10.3%,矸石比例60%以下的放煤口占86.9%;综放工作面的平均采出率约80.41%,最高采出率为84.3%。

     

    Abstract: In order to improve the top coal recovery rate of contiguous seams and lower thick seam by simultaneous mining, based on analyzing geological conditio n of Quandian Coal Mine, the paper used PFC simulation software to analyse the parameters of top coal caving, and determined the drawing interval was 0.6 m, and u sed uplink coal caving technique. The coal caving effect was measured, and observations results showed that average caving time of every support was 84 s, the size 0 f the broken top coal was under 10 cm, the size of the broken immediate roof was under 30 cm. After top coal caving, 10. 3% of the caving mouth didnDt find gangue, a nd 86. 9% of the caving mouth controlled the proportion of gangue under 60%, average recovery rate of the working face was 80. 41%, and the highest mining rate was 84.3%.

     

/

返回文章
返回