高级检索
孟凡刚, 党海波. 近距离倾斜煤层采掘顺序对巷道矿压影响的研究[J]. 煤炭科学技术, 2015, (9).
引用本文: 孟凡刚, 党海波. 近距离倾斜煤层采掘顺序对巷道矿压影响的研究[J]. 煤炭科学技术, 2015, (9).
Meng Fangang Dang Haibo, . Study on mining and excavation sequence in contiguous inclined seam affected to mine pressure of gateway[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (9).
Citation: Meng Fangang Dang Haibo, . Study on mining and excavation sequence in contiguous inclined seam affected to mine pressure of gateway[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (9).

近距离倾斜煤层采掘顺序对巷道矿压影响的研究

Study on mining and excavation sequence in contiguous inclined seam affected to mine pressure of gateway

  • 摘要: 基于巷道围岩稳定性控制理论,根据煤层赋存特征和工作面空间关系,建立FLAC3D数值模拟方案,分为先采后掘再采和先掘后采再采2套方案,分别就8号煤层采动和9号煤层采动对3093回风巷的影响进行了分析,从超前支承压力、底板采动压力和侧向支承压力3个方面分别对2089工作面和3093工作面的采动影响范围进行分析。研究结果表明:先掘后采方案所得的巷道围岩塑性区深度为3 m,顶板下沉量为65 cm,先采后掘方案所得的巷道围岩塑性区深度为0.5 m,顶板下沉量为22cm,应该优选先采后掘方案。

     

    Abstract: Based on surrounding rock stability control theory of mine roadway,according to seam formation features and space relationship of coal mining face,a FLAC 3 Dsimulation pane was established.There were two planes of mining first 1 late excavation 1 mining again and excavation first 1 late mining 1 mining again.An analysis was conducted on mining operation in No.8 seam and mining operation in No.9 seam affected to No.3093 tailentry gateway.An analysis was conducted on three aspects of adva nce support pressure,floor mining pressure and lateral support pressure affected to mining scope of No.2089 coal mining face and No. 3093 coal mining individually. The s tudy results showed that excavation first and mining second plan would have a depth of 3 m in the plastic zone of surrounding rock along roadway and roof subsidence val ue was 65 cm.The mining first and excavation second plan would have a depth of 0.5 m in the plastic zone of surrounding rock along roadway and roof subsidence value w. as 22 cm.Thus the mining first and excavation second plan should be optimized.

     

/