高级检索

高瓦斯综放工作面顶板破坏规律及高位钻孔抽采技术

Technology of roof failure law and high level borehole gas drainage in high gassy fully-mechanized top coal caving mining face

  • 摘要: 为了确定半孤岛综放工作面邻空侧巷道高位钻孔终孔位置,以石泉煤矿30103半孤岛综放工作面为研究对象,通过数值模拟方法研究了30103半孤岛综放工作面上部160~175 m范围上覆岩层破坏规律,结果表明:工作面上覆岩层塑性区发育顺序由工作面中部向工作面上部逐渐发育,工作面在回采60~80 m范围内,工作面垮落带高度为16~21 m,工作面断裂带高度为21~43 m;依据数值模拟结果设计高位钻孔终孔位置为工作面上部顶板25~35 m层位,钻孔分布范围为工作面上部160~180 m范围,通过现场实测分析得出了高位钻孔抽采效果明显,参数设计合理。

     

    Abstract: in order to determine the terminal location of the high level borehole in a gateway of a neighboring goaf in full -mechanized top coal caving mining face in a af island seam,based on No.30103 ful -mechanize top coal caving nining face in a af sand seamn of ShicuLan Mine as a studly objec a numerical fimulationmethod was applied to study the falure law of the overburden srata within150 ~ 175 m above No.30103 rul-mechanized top coal aing mining face. This resut thewed that the development sequence of the plastic:zone in the overburden strata of the cal mining face was obtined,which was steadiy developed from the midese cton of the coal mining face to the above strata of the cal mining face. Nhen the coal mining face was mining within adistance of 0 ~ 8o mthe hejghtof oo aing one in the coal mining face would be 16 ~ 21 m and the height of factured zone of the coal mining face woud be 21~ 43 m.According to therumericalsiyulato resis .the borehole terminal ocation of the high level borehcole designed would be at 25~ 35 m layer in the top oo ofthe cal mining fac.The borehoe d itributin sopewould be in 160 ~ 180 m scope above the coal mining face. The sie measurement anaysis showed that the drainage effect of the high level boreh ole was obvious andthe designed parameters were rational.

     

/

返回文章
返回