高级检索
马资敏, 郭志飚, 陈上元, 朱盛, 王进. 深部中厚煤层切顶留巷围岩变形规律与控制研究[J]. 煤炭科学技术, 2018, (2).
引用本文: 马资敏, 郭志飚, 陈上元, 朱盛, 王进. 深部中厚煤层切顶留巷围岩变形规律与控制研究[J]. 煤炭科学技术, 2018, (2).
MA Zimin, GUO Zhibiao, CHEN Shangyuan, ZHU Sheng, WANG Jin. Study on deformation law and control of surrounding rock in roofcutting gateway retained along goaf in deep medium thick seam[J]. COAL SCIENCE AND TECHNOLOGY, 2018, (2).
Citation: MA Zimin, GUO Zhibiao, CHEN Shangyuan, ZHU Sheng, WANG Jin. Study on deformation law and control of surrounding rock in roofcutting gateway retained along goaf in deep medium thick seam[J]. COAL SCIENCE AND TECHNOLOGY, 2018, (2).

深部中厚煤层切顶留巷围岩变形规律与控制研究

Study on deformation law and control of surrounding rock in roofcutting gateway retained along goaf in deep medium thick seam

  • 摘要: 为保证切顶卸压沿空留巷技术在深部中厚煤层中成功应用,综合运用理论分析、现场实测及数值模拟等方法对沿空巷道围岩结构变形规律及控制技术进行探索。研究结果表明:实施切顶卸压后,巷道受超前集中应力影响的范围和强度均有所降低;巷道围岩呈现稳定时间长及持续变形2大特点;滞后工作面距离大于440 m的巷道围岩基本稳定。在顶板初始运动阶段采用“恒阻锚索+单体棚”进行超前支护,顶板剧烈运动阶段采取“液压抬棚支架+单体棚”进行加强支护,顶板缓慢运动阶段回撤抬棚支架与单体,顶板相对稳定阶段加强断层带及硐室交岔口支护,碎石帮采用可伸缩性挡矸U型钢挡矸支护,可有效控制留巷围岩变形,成巷效果好。

     

    Abstract: In order to ensure a successful application of the gateway retained technology along the goaf with the roof cutting pressure released to a deep medium thick seam,a theoretical analysis,site measurement,numerical simulation and other methods were comprehensively applied to the study on the deformation law and control technology of the surrounding rock structure in the gateway retained along the goaf.The study results showed that after the roof cutting pressure releasing conducted,the pilot concentrated stress influence scope and strength of the gateway both were decreased.The surrounding rock in the gateway would have two features of a long stabilized time and continued deformation.The surrounding rock in the gateway with a distance over 440 m behind the coal mining face was stable basically.In the initial movement stage of the roof,a “constant resistant anchor + single props” was applied to the pilot support.In the roof serious movement stage,a “hydraulic lifting frame support + single prop shield” was applied to the enhanced support.In the roof gently slow movement stage,the hydraulic lifting frame supports and single prop were withdrawn.In the roof relative stable stage,a cross support at the fault zone and chamber was enhanced,a extensible U type steel retaining support was applied to the broken rock sidewall and could effectively control the surrounding rock deformation of the gateway with a good effect of the gateway.

     

/

返回文章
返回