高级检索

三维瞬变电磁法超前探测勘探钻孔封堵效果研究

Study on sealing effect of 3D transient electromagnetic method in-advancedetecting exploration drilling borehole

  • 摘要: 为了对煤矿地质调查的钻孔封堵效果做出有效评价,基于传统的瞬变电磁超前探测技术,设计在掘进工作面定点的多方向的小线圈三维超前探测技术及探测结果三维可视化方法,并在小回沟煤矿对BZ-13勘探钻孔的封堵效果进行了探测。研究结果表明:该钻孔在水平二维扇形拟断面图上成一个低于25 Ω·m的近似圆形的低阻区域,在垂直巷道掘进的二维扇形拟断面图上成一个低于25Ω·m的近似条带状低阻区域,依据矿区探测经验,视电阻率在20~25 Ω·m时,煤岩层会有少量含水,经钻探验证,瞬变电磁探测结果准确,说明该方法能够较准确地确定钻孔的位置以及其导含水情况;三维立体显示,使钻孔范围及位置更直观,呈现一个近似直立的圆柱状形态,使探测成果更加易于分析,可更好地指导煤矿安全生产。

     

    Abstract: In order to effectively evaluate the drilling plugging effect of coal mine geological survey, based on the traditional transient electromagnetic lead detection technology, the multi-directional three-dimensional lead-front detection technology for multi-directional positioning at the heading face and the three-dimensional visualization method for detecting results are designed. The sealing effect of Exploration Borehole BZ-13 was detected in Xiaohuigou Coal Mine. The results show that the borehole is an approximately circular low-resistance area of less than 25 Ω·m on the horizontal two-dimensional fan-shaped pseudo-section, and is less than 25 Ω·m on the two-dimensional fan-shaped cross-section of the vertical roadway. The approximate strip-shaped low-resistance area of m, according to the mining area experience, when the apparent resistivity is 20~25 Ω·m, there will be a small amount of water in the coal and rock layers. After drilling verification, the transient electromagnetic detection result is accurate, indicating that the method can be more accurate. The position of the borehole and its water-conducting condition are determined; the three-dimensional display makes the drilling range and position more intuitive, and presents an approximately upright cylindrical shape, which makes the detection results easier to analyze and better guides the safe production of coal mines.

     

/

返回文章
返回