高级检索
金向阳. 超前长距离大管棚支护在深表土层斜井施工的应用[J]. 煤炭科学技术, 2012, (6).
引用本文: 金向阳. 超前长距离大管棚支护在深表土层斜井施工的应用[J]. 煤炭科学技术, 2012, (6).
Pilot Long Distance Large Pipe Shield Support Applied to Construction of Mine Inclined Shaft in Deep Overburden Soil[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (6).
Citation: Pilot Long Distance Large Pipe Shield Support Applied to Construction of Mine Inclined Shaft in Deep Overburden Soil[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (6).

超前长距离大管棚支护在深表土层斜井施工的应用

Pilot Long Distance Large Pipe Shield Support Applied to Construction of Mine Inclined Shaft in Deep Overburden Soil

  • 摘要: 在斜井施工中,为了顺利通过含有深表土层、流砂层的地段,设计提出了超前长距离大管棚支护和冻结法2个可行的施工方案,经过详细的方案论证和技术经济比较,推荐采用了超前长距离大管棚支护方案,并在经坊煤矿成功采用导向跟管钻进技术实施超前长距离大管棚支护及滑模施工。工程实践表明,采用导向跟管钻进技术,能使超前大管棚一次支护长度达到160 m。与冻结法相比,超前长距离大管棚支护可使工期缩短77%、造价减少83%。同时,该施工方法成功推广到了庄子河煤矿。

     

    Abstract: In order to successfully pass through the deep overburden soil and quicksand section for the mine inclined shaft construction, two construction plans of a pilot long distance pipe shield support and ground freezing method were provided for the design.With the plan verification as well as the technical and economic comp arison, the guidence long distance large pipe shield support plan was applied.A guidence pipe drilling technology was successfully applied to conduct the pilot long dist ance large pipe shield support and the slip-form construction in Jingfang Mine.The project practices showed that the pilot pipe drilling technology was applied to make t he once support length of the pilot pipe shield reached to 160 m.In comparison with the ground freezing method, the pilot pipe shield support could make the constructi on period reduced by 77% and the cost could be reduced by 83% .Meanwhile, the construction method was successully promoted to Zhuangzihe Mine.

     

/

返回文章
返回