高级检索

深部沿空留巷顶板变形破坏规律及其控制研究

Research on deformation and failure law and control of roof in deep gob-side entry retaining

  • 摘要: 为解决深部沿空留巷顶板变形剧烈问题,采用FLAC3D数值模拟与工程验证相结合的方法,研究了顾桥煤矿1115工作面轨道巷基本顶从掘进到二次采动超前影响阶段运动演化规律。结果表明:①顶板变形在掘进阶段呈对称分布,一次采动超前影响阶段出现向工作面侧旋转的偏态特征,顶板下沉曲线交点的斜率为7.25×10-4,留巷阶段顶板向采空侧回转下沉,此时的交点斜率增长了6倍,偏态效应显著加强,二次采动超前影响阶段顶板下沉曲线交点的斜率比留巷期间增长了3.2倍,偏态效应有所增加,但以平移下沉为主;②顶板变形量随着留巷进行逐渐增加,掘进期间巷道顶板最大下沉量为69.2 mm。以后每阶段较前一阶段变形量增长了0.99倍、0.82倍和2.13倍,可见沿空留巷顶板变形逐渐剧烈,支护难度显著增加,应统筹对沿空留巷进行支护设计;③提出了保证直接顶完整、各阶段逐级强化和减弱顶板变形偏态现象的深部沿空留巷顶板控制原则,经工程验证可实现消弱深部沿空留巷顶板剧烈变形。

     

    Abstract: In order to solve the problem of severe deformation of the roof in deep gob-side entry retaining, the combination of FLAC3D numerical simulation and engineering practice were applied to study the evolution law of the basic top of the track roadway of the 1115 working face in Guqiao Coal Mine from the excavation to the secondary mining stage. The results showed that: ① The deformation of the roof is symmetrically distributed during the excavation stage. The slope of the intersection of the roof sinking curve is 7.25×10-4 during the first mining influenced stage, the slope of the intersection point has increased by 6 times during roadway retaining, and the skew effect is significantly enhanced. The slope of the intersection point of the roof sinking curve of the secondary mining stage is 3.2 times bigger than that during the roadway retaining. The skew effect is increased, but mainly due to translational subsidence; ② The deformation of the roof is gradually increased, and the maximum subsidence of the roof of the roadway during the excavation is 69.2mm. In the future, the deformation of each stage increased by 0.99 times, 0.82 times and 2.13 times compared with the previous stage. The deformation of the roof along the roadway is gradually becoming more and more severe, and the difficulty of support is significantly increased. The support design of the roadway along the gob should be coordinated. ③ The principle of roof control for deep mine along the roadway is proposed by the principle of ensuring the completeness of the immediate roof, step-by-step strengthening of each stage and weakening deformation of the roof. The engineering verification can achieve the strong deformation of the roof of the roadway along the deep roadway.

     

/

返回文章
返回