WANG Bo, ZHANG Haifeng, YANG Zhangjie, ZHANG Dunxi, Yu Dajun. Study on pre-grouting reinforcement technology by multi-step coupling under static and dynamic pressure in fault structural zone of working face[J]. COAL SCIENCE AND TECHNOLOGY, 2022, 50(6): 186-195.
Citation: WANG Bo, ZHANG Haifeng, YANG Zhangjie, ZHANG Dunxi, Yu Dajun. Study on pre-grouting reinforcement technology by multi-step coupling under static and dynamic pressure in fault structural zone of working face[J]. COAL SCIENCE AND TECHNOLOGY, 2022, 50(6): 186-195.

Study on pre-grouting reinforcement technology by multi-step coupling under static and dynamic pressure in fault structural zone of working face

Funds: 

Key Research and Development Program of Anhui Province (1804a0802210); Key Research and Development Program of Anhui Province (1704a0802130)

More Information
  • Available Online: April 02, 2023
  • Published Date: June 24, 2022
  • When the working face of the coal mine encounters a fault zone with complex original rock stress environment affected by mining activation during the mining process, in order to solve a series of problems such as difficulties in roof and coal wall support, low mining efficiency of broken surrounding rock, high mining cost and poor safety when stopping mining and stopping face reinforcement, the UDEC numerical simulation method was used to establish a working face fault activation model.The stress distribution characteristics of the original rock in the fault structural belt, the activation process of the fault during the mining process of the working face, and the development and evolution law of the rock mass fracture during the mining process were analyzed and it was determined that the reasonable and effective distances of the two-stage pre-grouting of static and dynamic pressure were 300-400 m and 30-50 m ahead of the working face.Through the grading and progressive arrangement of parallel and fan-shaped grouting holes in the fault structure zone, the calculation and selection of high-pressure grouting equipment and pump efficiency check, and the design and strength check of “two blocks, one injection+exhaust pipe” high pressure (15-20 MPa) positioning sealing method,the combined hydrostatic and dynamic pressure multi-step coupling pre-grouting key fault zone reinforcement technology including curtain grouting (0-10 m hole), shallow hole grouting (10-30 m hole), medium and deep hole grouting (30-80 m hole) and reserved deep hole grouting (80-130 m hole) was formed.The long-distance high-pressure grouting with grouting pressure of 5-15 MPa, grouting flow of 0~6 m3/h and grouting range 0~150 m has been realized, and the goal of 30~400 m pre grouting in advance working face to strengthen the coal and rock mass in the fault fracture zone has been achieved. The technology has been successfully applied in HuainanMining Area. When the working face passes through the fault,there is no rib spalling and roof fall, the working condition of the support is stable, and the supporting condition of the gateway is good during working face passing fault. The advancing degree of the working face is about 6 m/d, and the efficiency is increased by 1-2 times, realizing the continuous and efficient recovery of the working face across the fault without breaking the face.
  • Cited by

    Periodical cited type(3)

    1. 杨婷. 基于热重-质谱联用技术的兰炭与木炭燃烧特性研究. 上海化工. 2025(01): 22-26 .
    2. 林建功,张孝禹,惠吉成,朱书骏,朱建国. 煤矸石与气化飞灰的热重-质谱混燃机理. 煤炭学报. 2024(11): 4634-4645 .
    3. 王小令,王绍清,陈昊,赵云刚,沙吉顿,李慷. 不同镜惰比低阶煤的结构特征及其热解行为. 煤炭科学技术. 2023(05): 294-301 . 本站查看

    Other cited types(4)

Catalog

    Article views PDF downloads Cited by(7)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return