Advance Search
Research and Design on Early Warning System of Dangerous Sources Based on GIS and Multi Agent[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (7).
Citation: Research and Design on Early Warning System of Dangerous Sources Based on GIS and Multi Agent[J]. COAL SCIENCE AND TECHNOLOGY, 2011, (7).

Research and Design on Early Warning System of Dangerous Sources Based on GIS and Multi Agent

  • According to the space analysis complexity and the decision intelligent requirements of the mine dangerous source early warning system, based on the r esearch on the GIS regional-single combined judge early warning model, the multi Agent technology in the artificial intelligent was applied to the dangerous source earl y warning system to form the data Agent, management Agent, GIS-Agent, and other main component.Thus a dangerous source early warning system was designed bas ed on the GIS and multi Agent.In combination with the certain projects, the cases were conducted.The beneficial discoveries were conducted on the dangerous source early warning itelligent.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return