Replacement Method and Safety Analysis on First Rope of Mine Shaft Hoist
-
Graphical Abstract
-
Abstract
According to the complicated process, high operation difficulty, danger and other problems of the conventional first rope replacement method for the min e hoist, based on the application of the a new rope replacement equipment, a new first rope replacement method of the mine hoist steel rope was provided.In comparis on with the conventional rope replacement method, the new rope replacement method could save the rope replacement time about 10 h.The safety analysis showed tha t the new rope replacement method could reduce the weights of the mine cage and steel rope, improve the mine hoisting capacity and in essence reduce the probability of the rope sliding accident occurred.The multi-rope synchronous in and out replacement method could reduce the complicated coordinative operation and improve the r ope replacement speed.Due to the steel rope was always in a stressed condition, the rope twisted could be prevented and the rope safety could be improved.
-
-