Advance Search
Zhao Yanhai Song Xuanmin Liu Ningbo, . Research on stability of coal pillar and roadway layout optimization in shallow multi-seams[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (12).
Citation: Zhao Yanhai Song Xuanmin Liu Ningbo, . Research on stability of coal pillar and roadway layout optimization in shallow multi-seams[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (12).

Research on stability of coal pillar and roadway layout optimization in shallow multi-seams

More Information
  • Available Online: April 02, 2023
  • Published Date: December 24, 2015
  • In order to solve the problems of dfficult stress zone division and roadway layout in shallow multi- seams mining, according to the actual condition of Bul ianta Coal Mine, the stress at the bottom of upper pillar and deformation of surrounding rock in lower roadway were analyzed by theoretical analysis, field observation a nd numerical simulation. The size of coal pillar and staggered distance of extraction roadway were researched in the process of downward combined mining in shallow coal seams. The results showed that for stress areas were determined inaccurately, roadway could not completely avoid high stress areas in some cases, in a consequ ence, roadway deformation for the stress increased sharply in lower seams. By the comparison of numerical simulation, the width of lower seam pillar adopted 26 m, it was44% larger than former data, stagger distance of roadway adopted 32 m, the deformation of floor and two sides in the roadway were reduced obviously.
  • Related Articles

    [1]ZHANG Jie, SUN Jianping, HE Yifeng, ZHANG Yiming, PANG Haibo, WU Haohao, ZHANG Jianchen, PENG Bing. Study on floor stress distribution law and roadway layout of contiguous coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2024, 52(8): 11-22. DOI: 10.12438/cst.2023-1063
    [2]GUO Shibin, HU Guozhong, ZHU Jiaxin, XU Jialin, QIN Wei, YANG Nan. Intelligent prediction method for roof gas drainage roadway layout[J]. COAL SCIENCE AND TECHNOLOGY, 2024, 52(4): 203-213. DOI: 10.12438/cst.2024-0065
    [3]LYU Kai, HE Fulian, XU Xuhui, WANG Fuzhong, QIN Binbin, LI Liang. Layout of roadway under goaf based on scale effect of mining cross upper coal pillar[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(3): 52-60. DOI: 10.13199/j.cnki.cst.2021-0610
    [4]ZHANG Baoyou. Study on the layout of staggered roadway and surrounding rock control technology for extremely close coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(8): 88-95.
    [5]DAl Wenxiang. Study on layout and support technology of strongly disturbed roadway in contiguous coal seam[J]. COAL SCIENCE AND TECHNOLOGY, 2020, 48(12).
    [6]Meng Hao. Study on layout optimization of seam gateway under contiguous seams[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (12).
    [7]Luo Daihong. Study on roadway reasonable layout in steeply inclined contiguous coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (11).
    [8]JiangLun Lan Yu, . Research on optimal layout of gateway in inclined ultra thick coal seam[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (11).
    [9]ZHANG Chun-lei ZHANG Yong, . Study on Optimal Roadways Layout of Contiguous Seams by Simultaneous Mining[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (10).
    [10]GUO Xiao-qiang DOU Lin-ming XU Bi-gen TANG Shao-hui WEN Xing, . Technology of Preventing Rock Burst by Lateral Layout Roadway Near Goaf[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (2).

Catalog

    Article views (140) PDF downloads (280) Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return