Advance Search
ZHANG Zhi-yan. Analysis on Gateway Layout Pattern of Fully- Mechanized Top Coal Caving Face[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (2).
Citation: ZHANG Zhi-yan. Analysis on Gateway Layout Pattern of Fully- Mechanized Top Coal Caving Face[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (2).

Analysis on Gateway Layout Pattern of Fully- Mechanized Top Coal Caving Face

More Information
  • Available Online: April 02, 2023
  • Published Date: February 24, 2014
  • In combination with mining features of the ultra thick and thick seams in China, the paper summarized the gateway layout pattern of fully- mechanized to p coal caving mining face in China. The present gateway layout patterns of fully- mechanized top coal caving mining face in China were mainly the two gateways layout of the coal mining face and the multi gateways layout of the coal mining face. The paper stated the mine geological condition, gas deposit condition and coal mining eq uipment affected to the gateway layout pattern. In combination with the different gateway layout patterns of the fully- mechanized top coal caving mining face in Tangsh an Mine, the paper in detail explained the suitability of the different gateway layout patterns to different mine conditions.
  • Related Articles

    [1]CUI Feng, FENG Ganggui, JIA Chong, ZHANG Suilin, SUN Jingxuan. Study on reasonable advancing speed of fully-mechanized top-coal caving face in mining contugous  extra-thick coal seams in rockburst mine[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(7): 287-297. DOI: 10.13199/j.cnki.cst.2022-0729
    [2]Wang Zhiqiang Wang Peng, . Study on gateway driving technology along goaf applied to layout of displaced layer gateway in ultra thick seam[J]. COAL SCIENCE AND TECHNOLOGY, 2017, (3).
    [3]Kuang Tiejun. Study on overburden strata movement law at face end of high cutting fully-mechanized top coal caving face in ultra thick seam[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (6).
    [4]JiangLun Lan Yu, . Research on optimal layout of gateway in inclined ultra thick coal seam[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (11).
    [5]XIE Guang - xiang, TANG Yong - zhi, WANG Lei. Time - Space - Strength Coordinative Mining Technology of High Gassy Seams Group[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (11).
    [6]XU Yong-xiang LI Hua-min WANG Kai-lin YUAN Rui-fu, . Study on Lateral Support Pressure Distribution of Fully-Mechanized Coal Mining Face in Ultra Thick Seam[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (11).
    [7]LOU Jin-fu. Experimental Research on Fully-Mechanized Mining with Large Cutting Height in Spontaneous Combustion Thick Coal Seam[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (5).
    [8]ZHANG Zhong-wen. Coordinated Mining Technology of Contiguous Ultra Thick Seams in Mine with Annual Production over 10 Million Tons[J]. COAL SCIENCE AND TECHNOLOGY, 2013, (11).
    [9]New Backfill Material Applied to High Roof Falling Zone of Ultra Thick Seam Gateway[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (9).
    [10]Effect Analysis on Gas Control with Local High Level Gas Drainage Gateway at Initial Mining Period of Fully Mechanized Top Coal Caving Mining Face[J]. COAL SCIENCE AND TECHNOLOGY, 2012, (5).
  • Cited by

    Periodical cited type(1)

    1. 单仁亮,韩天宇,荆国业,谭杰,李伟捷,乔东杰,许镇宇,付新鹏. 钻井法超深井筒固井前竖向结构稳定性研究. 煤炭学报. 2024(S2): 542-552 .

    Other cited types(1)

Catalog

    Article views (195) PDF downloads (394) Cited by(2)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return