Advance Search
LI Feng-qi QIAO Wei NIU Guo-bin YANG Sheng-qiang JIANG Chun-lin, . Gas Pre-Drainage Technology of Ground Multi- Branch Horizontal Well Connected with Underground Mine Borehole[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (5).
Citation: LI Feng-qi QIAO Wei NIU Guo-bin YANG Sheng-qiang JIANG Chun-lin, . Gas Pre-Drainage Technology of Ground Multi- Branch Horizontal Well Connected with Underground Mine Borehole[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (5).

Gas Pre-Drainage Technology of Ground Multi- Branch Horizontal Well Connected with Underground Mine Borehole

  • According to the problem of time and space limitations when gas pre-drainage through underground mine borehole and ground multi-branch horizontal w ell, the gas pre-drainage technology of ground multi-branch horizontal well connected with underground mine borehole was put forward, and it was used in multi-branch horizontal connection well engineering of No. 24307 working face Shaqu Mine. After connection, the gas production rate of gas drainage borehole XC01 was 6 000 ~ 7 000 m3/d and the average gas concentration was 95%; the gas production rate of gas drainage borehole XC02 was around 12 000 m3/d and the average gas concentra tion was 91.05%. The gas production of single well and gas drainage ratio grew significantly.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return