Advance Search
Issue 5
May  2016
Turn off MathJax
Article Contents
Bi Yansen Xian Baoan Zhang Xiaobin, . Fiber reinforced plastic screen pipe completion technology of coalbed methane horizontal well[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (5).
Citation: Bi Yansen Xian Baoan Zhang Xiaobin, . Fiber reinforced plastic screen pipe completion technology of coalbed methane horizontal well[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (5).

Fiber reinforced plastic screen pipe completion technology of coalbed methane horizontal well

More Information
  • Available Online: April 02, 2023
  • Published Date: May 24, 2016
  • According to the fiber reinforced plastc screen pipe completon technicue with the stable maintained well a. igh eficient sand prevention.,ust prevention and anti-coosion.safety and economic realization of the pipestring reenterto complete the ru ellfushing and other advantages.based on the f.er reinforced plastic screen pipe completion techique as a new completion tfechnique an inovated design was conducted on the completon ofthe coaled metod hoizonta open welland PE screen pipe completion technology.The analysis on the fier reinfoced plastic sceen pe completion feaures and advantages shoved thth fi r renfocedplasic screen pipe with low frction factor would be favorable to the pipe string down sting operation.the f.er reinfoced lasti: screen pipe with a igh strength wouldcbe favorable to ensure the integration of the horizontal secional channel and could realize the tu e lfushing operation at thelate horzontal ell ection and the fi erreinforced plastic screen pipe with non-metallic material would be favorable to the savety mining operation at the lave of mine.T he fibrinoced platit sceen poe with a wash pipe as an internal pipe could set up drlling mud crculaton in the vwhole operaion process coul ffectively andlethe jaming phenomenon occuredin hescreen pipe down setting process,could eaize well fushing with high pressurized hyraulic jting and coud tnost reduce thersevoi faire ocurd it he previous operation process.The technique was appied to construct 32 gas wels io Shan i calbed imetan stie a total length of sc.een pipe down eting was 4 $ 62 m and the successful rate was 100%./n adtition,the technique could play a promotion ole to the colbed methane development and calbed methane horzontal completion t chnique and technology development.
  • Cited by

    Periodical cited type(9)

    1. 郭昆明. ?200 mm定向高位大直径一次成孔工艺技术的应用. 能源与环保. 2025(02): 31-35+41 .
    2. 张占强. BLY1000/16型煤矿井下钻探用泥浆泵车设计. 煤矿机械. 2024(07): 5-7 .
    3. 陈超,陈天柱,张马军,王常委. 孤岛工作面碎软煤层跟管护孔钻进工艺研究. 工矿自动化. 2023(01): 73-79 .
    4. 段会军. 复杂顶板岩层大直径高位定向钻孔装备与技术. 煤炭技术. 2023(07): 112-115 .
    5. 段会军. 软硬互层顶板大直径定向钻孔成孔技术研究. 中国煤炭地质. 2023(10): 47-51 .
    6. 刘见中. 强化科技创新推动煤炭行业高质量发展研究. 中国煤炭. 2022(04): 1-7 .
    7. 冷明友. 顶板大直径定向钻孔快速施工技术研究. 矿山机械. 2022(07): 8-11 .
    8. 唐敏. 自动钻机集群作业线在Ⅲ1022底抽巷的研究与应用. 煤炭技术. 2022(08): 115-118 .
    9. 陶云奇,张剑钊,郭明功,于红,潘仁杰. 采动卸压瓦斯抽采以孔代巷技术研究与工程实践. 矿业安全与环保. 2022(05): 43-48 .

    Other cited types(0)

Catalog

    Article views PDF downloads Cited by(9)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return