Advance Search
Li Yujin Zhang Baolian, . Study on overwinding dynamics of mine shaft hoisting device[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (1).
Citation: Li Yujin Zhang Baolian, . Study on overwinding dynamics of mine shaft hoisting device[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (1).

Study on overwinding dynamics of mine shaft hoisting device

More Information
  • Available Online: April 02, 2023
  • Published Date: January 24, 2016
  • According to overvwinding braking featues of a mine shaft oisting device,from view of a dynamics,verwinding dynanics model ofthe hoisting device was established.Acalculation method of overwinding braking force braking deceleraion and steel wire rope impact fore was provided. The calculatonresuts shoved that overvinding braking deceleration of cage hoisting should be less than g and overwinding braking deceleration of soip hoisting should be lss than 2g .Ades gn method to restrict the inmpact force of the seel wire rope was provided.BEased on conception to restriet the inmpact.the braking peromances of GJ-D te l tand type overwinding buifer device were optinized for the mine shaft oisting. he results showed that the overwinding protecton deice to restrcthe impact force aplied could reduce the stresses of mine shaft headframe and mine shaft towercould reduce 1 2 impact foce to the hoistng stee irerope and could improve the safet relaility of the hoisting system
  • Related Articles

    [1]ZHANG Jie, SUN Jianping, HE Yifeng, ZHANG Yiming, PANG Haibo, WU Haohao, ZHANG Jianchen, PENG Bing. Study on floor stress distribution law and roadway layout of contiguous coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2024, 52(8): 11-22. DOI: 10.12438/cst.2023-1063
    [2]GUO Shibin, HU Guozhong, ZHU Jiaxin, XU Jialin, QIN Wei, YANG Nan. Intelligent prediction method for roof gas drainage roadway layout[J]. COAL SCIENCE AND TECHNOLOGY, 2024, 52(4): 203-213. DOI: 10.12438/cst.2024-0065
    [3]LYU Kai, HE Fulian, XU Xuhui, WANG Fuzhong, QIN Binbin, LI Liang. Layout of roadway under goaf based on scale effect of mining cross upper coal pillar[J]. COAL SCIENCE AND TECHNOLOGY, 2023, 51(3): 52-60. DOI: 10.13199/j.cnki.cst.2021-0610
    [4]ZHANG Baoyou. Study on the layout of staggered roadway and surrounding rock control technology for extremely close coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(8): 88-95.
    [5]DAl Wenxiang. Study on layout and support technology of strongly disturbed roadway in contiguous coal seam[J]. COAL SCIENCE AND TECHNOLOGY, 2020, 48(12).
    [6]Meng Hao. Study on layout optimization of seam gateway under contiguous seams[J]. COAL SCIENCE AND TECHNOLOGY, 2016, (12).
    [7]Luo Daihong. Study on roadway reasonable layout in steeply inclined contiguous coal seams[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (11).
    [8]JiangLun Lan Yu, . Research on optimal layout of gateway in inclined ultra thick coal seam[J]. COAL SCIENCE AND TECHNOLOGY, 2015, (11).
    [9]ZHANG Chun-lei ZHANG Yong, . Study on Optimal Roadways Layout of Contiguous Seams by Simultaneous Mining[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (10).
    [10]GUO Xiao-qiang DOU Lin-ming XU Bi-gen TANG Shao-hui WEN Xing, . Technology of Preventing Rock Burst by Lateral Layout Roadway Near Goaf[J]. COAL SCIENCE AND TECHNOLOGY, 2014, (2).

Catalog

    Article views PDF downloads Cited by()
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return