高级检索

煤矿井下双级双速扩孔技术研究与应用

赵建国, 李泉新, 刘建林, 杨冬冬

赵建国, 李泉新, 刘建林, 杨冬冬. 煤矿井下双级双速扩孔技术研究与应用[J]. 煤炭科学技术, 2021, 49(7): 133-138.
引用本文: 赵建国, 李泉新, 刘建林, 杨冬冬. 煤矿井下双级双速扩孔技术研究与应用[J]. 煤炭科学技术, 2021, 49(7): 133-138.
ZHAO Jianguo, LI Quanxin, LIU Jianlin, YANG Dongdong. Research and application of two-stage and two-speed reaming technology in coal mine[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(7): 133-138.
Citation: ZHAO Jianguo, LI Quanxin, LIU Jianlin, YANG Dongdong. Research and application of two-stage and two-speed reaming technology in coal mine[J]. COAL SCIENCE AND TECHNOLOGY, 2021, 49(7): 133-138.

煤矿井下双级双速扩孔技术研究与应用

Research and application of two-stage and two-speed reaming technology in coal mine

  • 摘要: 针对顶板高位大直径定向钻孔分级扩孔综合效率低、钻具安全性差等问题,开发了双级双速扩孔方法,研制了双级双速扩孔钻具,包括直螺杆马达、一级钻头与二级钻头。运用等碎岩比功理论开展双级双速扩孔分级研究,确定了一级钻头与二级钻头切削分界面直径为157 mm,一级钻头外径为165~172 mm。分别从壳体、马达动力总成、万向轴总成、传动轴总成与连接模块等方面开展设计研究,研制了105 mm双级双速螺杆马达。采用参数化设计方法,配套研制了多种规格的一级钻头与二级钻头。现场试验结果表明,双级双速扩孔技术可将高位定向钻孔直径由120 mm一次增扩至200 mm,综合钻进效率得到提高,钻孔瓦斯抽采效果良好,为工作面采动卸压瓦斯高效抽采定向长钻孔快速成孔提供了新方法。
    Abstract: Aiming at the problems of low comprehensive efficiency and poor safety of drilling tools, a two-stage and two-speed reaming method is developed. A two-stage and two-speed reaming drilling tool is developed, including a straight screw motor, a first-stage bit and a second-stage bit. Based on the theory of specific work of equal broken rock, the study of reaming classification is carried out. The cutting boundary diameter between the first and second drill bits is 157 mm, and the outer diameter of the first drill bit is 165~172 mm. The design and research are carried out from the aspects of shell, motor power assembly, cardan shaft assembly, transmission shaft assembly and connection module, and the 105 mm two-stage and two-speed screw motor is developed. By means of parametric design, various specifications of first and second stage bits are developed. The field test results show that the two-stage and two-speed reaming technology can increase the diameter of high-level directional drilling from [JP3]120 mm to 200 mm at one time, improve the comprehensive drilling efficiency, and provide a new method for the quick hole formation of directional long drilling with high-efficiency gas drainage under pressure relief.
  •   双级双速扩孔技术原理

      双级双速扩孔破碎环

      双级双速螺杆马达结构示意

      双级双速螺杆马达传动轴总成

      传动轴锁紧状态示意

      双级双速螺杆马达样机

      一级钻头

      200 mm二级钻头

      双级双速扩孔钻具实物

  • 期刊类型引用(9)

    1. 郭昆明. ?200 mm定向高位大直径一次成孔工艺技术的应用. 能源与环保. 2025(02): 31-35+41 . 百度学术
    2. 张占强. BLY1000/16型煤矿井下钻探用泥浆泵车设计. 煤矿机械. 2024(07): 5-7 . 百度学术
    3. 陈超,陈天柱,张马军,王常委. 孤岛工作面碎软煤层跟管护孔钻进工艺研究. 工矿自动化. 2023(01): 73-79 . 百度学术
    4. 段会军. 复杂顶板岩层大直径高位定向钻孔装备与技术. 煤炭技术. 2023(07): 112-115 . 百度学术
    5. 段会军. 软硬互层顶板大直径定向钻孔成孔技术研究. 中国煤炭地质. 2023(10): 47-51 . 百度学术
    6. 刘见中. 强化科技创新推动煤炭行业高质量发展研究. 中国煤炭. 2022(04): 1-7 . 百度学术
    7. 冷明友. 顶板大直径定向钻孔快速施工技术研究. 矿山机械. 2022(07): 8-11 . 百度学术
    8. 唐敏. 自动钻机集群作业线在Ⅲ1022底抽巷的研究与应用. 煤炭技术. 2022(08): 115-118 . 百度学术
    9. 陶云奇,张剑钊,郭明功,于红,潘仁杰. 采动卸压瓦斯抽采以孔代巷技术研究与工程实践. 矿业安全与环保. 2022(05): 43-48 . 百度学术

    其他类型引用(0)

图(9)
计量
  • 文章访问数:  104
  • HTML全文浏览量:  3
  • PDF下载量:  344
  • 被引次数: 9
出版历程
  • 网络出版日期:  2023-04-02
  • 发布日期:  2021-07-24

目录

    /

    返回文章
    返回